The news is by your side.

- Advertisement -

LASG Recalls CCECC To Commence Construction Works At Lagos- Badagry Expressway

The Lagos State Governor, Babajide Sanwo – Olu has recalled road contractor, Chinese Civil Engineering Construction Company (CCECC) to site for it to commence construction work along Lagos / Badagry Expressway.

 

The governor who promised that the completion of work along the corridor would be completed before the end of December 2019.

 

Speaking at the flag-off of the 60-kilometer road from Eric Moore to Badagry, according to the governor, who was represented by Deputy Governor Dr Obafemi Hamzat, said the government was committed to the welfare of the citizen,even as he stressed the need for the citizens to reciprocate the government’s gesture.

 

- Advertisement -

- Advertisement -

He noted that construction will end the neglect and hardship suffered daily by residents of that part of the metropolis, where traffic snarl, robbery and deaths have become a daily experience.

 

He said a section of the expressway from Agboju, a suburb of Lagos to Trade Fair Complex will be completed before the end of the year while the other stretch to Badagry will be rehabilitated with palliative measures to make it motorable to the public.

ALSO READ  Troops Of 1 Division Nabs 47 Rail Track Vandals In Kaduna

 

He lauded the cooperation between the Federal Government and the state government, saying the Federal Road Emergency Maintenance Agency (FERMA) was currently rehabilitating the Igboelerin section to Agbara road while the Federal Ministry of Works was building a six -lane road from Agbara to Seme Border.

 

The governor lamented frequent cases of traffic offences by motorist who drive against traffic warning that full weight of the law will be brought upon offenders.

 

‘’As we were coming from this road this morning, we saw vehicles facing one way in the process we stopped some of them; we turned them back and some of them, we asked officers of the Lagos State Traffic Management Authority (LASTMA) to go and prosecute them.

 

- Advertisement -

“Now, a lot of our citizens on the roads were giving excuses that ‘there is no road that is why we have to face one way’. Unfortunately, on that same road we saw a young man that was hit by commercial motorcyclist also known as ‘Okada’ while taking one way. So that young man can be anybody’s brother, somebody’s cousin, somebody’s father.

ALSO READ  Truck Owners Want FG To Caution Hi- Tech Over Delay On Mile 2-Coconut Corridor Completion

 

So we cannot say because the road is not in good shape and allow people to break the law.

 

“On June 2nd, just two days after our inauguration Governor Sanwo-Olu and myself have been here and I am here again to show Lagosians that this is a very critical road for us and that construction will start again on this road and that is why we are here today to fulfil that promise.

 

“As you will recall, it is a massive road, we are expanding four to 10 lanes , it is a 60 kilometre road from Bode Thomas all the way to Okokomaiko.

 

“That is what we are doing and the essence is to say that we will again start all over again. From Agboju to Trade Fair, that road will be completed this year.

ALSO READ  TRANSPORTATION REFORMS:  LBSL Increases Fleet Of Buses , Now Operates 252 Buses

 

“That is from the four lanes to 10 lanes. At least we saw the state of the road presently. The palliative measures will start from Trade Fair all the way to Okokomaiko to make it motorable for our people, while the construction of that parts that takes us to Okokomaiko will continue. It is important to stress the cooperation between the Lagos State Government and Federal Government of Nigeria.

 

“Today, FERMA has awarded the rehabilitation from Igboelerin to Agbara. That rehabilitation will maintain the four lanes, the reason is clear because on that axis, you have pipelines and various infrastructure we want to make sure that it is preserved. That will make it motorable for Lagosians.”

 

Speaking at the event, China Civil Engineering Construction Company (CCECC) General Manager, Lagos Head office, Mr. Bill Bian hailed the governor for bringing them back to site and pledged their preparedness to deliver on the timeline for the project.

Comments are closed.